We added a room and distribute the wiring to the ceiling fan, lights, outlets etc. Then, we connected the wires to the power.
Author: admin
Remodeling Shower
The water leaked through different parts of the glass walls, and the shower walls were cracked. To avoid mold we installed the new walls and the seals of the glass walls.
Painting Unit
We painted this unit bright and light colors, we painted the baseboards, ceiling, and doors the color white.
Installing Ceramic
After painting, we removed the vinyl, cleaned the floor, and replaced it with ceramic wood. We did a different design for the ceramic in the kitchen.
Happy Holidays
Maintenance Builders Happy Holidays
Painting Unit
We repainted the apartment with the color beige.
Office Mail Box
Installing an office mailbox to deposit mail, checks, etc.
Bathtub Drain Line
We dug a hole to replace a broken rusted pipe with a new one.
Happy Thanksgiving
Have a stupendous Thanksgiving! We hope you have a wonderful day today!
Painting Unit
We painted this unit, but first covered the dark areas with primer, the floor was not covered because we installed ceramic after painting.