
We added a room and distribute the wiring to the ceiling fan, lights, outlets etc. Then, we connected the wires to the power.
We added a room and distribute the wiring to the ceiling fan, lights, outlets etc. Then, we connected the wires to the power.
The water leaked through different parts of the glass walls, and the shower walls were cracked. To avoid mold we installed the new walls and the seals of the glass walls.
We painted this unit bright and light colors, we painted the baseboards, ceiling, and doors the color white.
After painting, we removed the vinyl, cleaned the floor, and replaced it with ceramic wood. We did a different design for the ceramic in the kitchen.
Maintenance Builders Happy Holidays
We repainted the apartment with the color beige.
Installing an office mailbox to deposit mail, checks, etc.
We dug a hole to replace a broken rusted pipe with a new one.
Have a stupendous Thanksgiving! We hope you have a wonderful day today!
We painted this unit, but first covered the dark areas with primer, the floor was not covered because we installed ceramic after painting.