
A drywall repair.
A drywall repair.
Installing security cameras.
We took three hours to install a new valve of the bath tub and everything was perfect at the end.
Putting new breaker, old is bad.
New bypass valve.
Water line broken we took several hours to fix it.
Big problems great solutions.
After the relay was burned by a short circuit we installed a new one.
Bad capacitors in air conditioner.
Installed new grills with lids everywhere to protect people from the fire.
Installing new wall boards.